Microsoft Power BI and Acuity Scheduling Integration

90% cheaper with Latenode

AI agent that builds your workflows for you

Hundreds of apps to connect

Visualize Acuity Scheduling data in Microsoft Power BI reports. Latenode's visual editor simplifies the data flow, adding custom logic with JavaScript for advanced reporting that scales affordably.

Microsoft Power BI + Acuity Scheduling integration

Connect Microsoft Power BI and Acuity Scheduling in minutes with Latenode.

Start for free

Automate your workflow

Swap Apps

Microsoft Power BI

Acuity Scheduling

Step 1: Choose a Trigger

Step 2: Choose an Action

When this happens...

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

description of the trigger

Name of node

action, for one, delete

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Do this.

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

description of the trigger

Name of node

action, for one, delete

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Try it now

No credit card needed

Without restriction

How to connect Microsoft Power BI and Acuity Scheduling

Create a New Scenario to Connect Microsoft Power BI and Acuity Scheduling

In the workspace, click the “Create New Scenario” button.

Add the First Step

Add the first node – a trigger that will initiate the scenario when it receives the required event. Triggers can be scheduled, called by a Microsoft Power BI, triggered by another scenario, or executed manually (for testing purposes). In most cases, Microsoft Power BI or Acuity Scheduling will be your first step. To do this, click "Choose an app," find Microsoft Power BI or Acuity Scheduling, and select the appropriate trigger to start the scenario.

Add the Microsoft Power BI Node

Select the Microsoft Power BI node from the app selection panel on the right.

+
1

Microsoft Power BI

Configure the Microsoft Power BI

Click on the Microsoft Power BI node to configure it. You can modify the Microsoft Power BI URL and choose between DEV and PROD versions. You can also copy it for use in further automations.

+
1

Microsoft Power BI

Node type

#1 Microsoft Power BI

/

Name

Untitled

Connection *

Select

Map

Connect Microsoft Power BI

Sign In

Run node once

Add the Acuity Scheduling Node

Next, click the plus (+) icon on the Microsoft Power BI node, select Acuity Scheduling from the list of available apps, and choose the action you need from the list of nodes within Acuity Scheduling.

1

Microsoft Power BI

+
2

Acuity Scheduling

Authenticate Acuity Scheduling

Now, click the Acuity Scheduling node and select the connection option. This can be an OAuth2 connection or an API key, which you can obtain in your Acuity Scheduling settings. Authentication allows you to use Acuity Scheduling through Latenode.

1

Microsoft Power BI

+
2

Acuity Scheduling

Node type

#2 Acuity Scheduling

/

Name

Untitled

Connection *

Select

Map

Connect Acuity Scheduling

Sign In

Run node once

Configure the Microsoft Power BI and Acuity Scheduling Nodes

Next, configure the nodes by filling in the required parameters according to your logic. Fields marked with a red asterisk (*) are mandatory.

1

Microsoft Power BI

+
2

Acuity Scheduling

Node type

#2 Acuity Scheduling

/

Name

Untitled

Connection *

Select

Map

Connect Acuity Scheduling

Acuity Scheduling Oauth 2.0

#66e212yt846363de89f97d54
Change

Select an action *

Select

Map

The action ID

Run node once

Set Up the Microsoft Power BI and Acuity Scheduling Integration

Use various Latenode nodes to transform data and enhance your integration:

  • Branching: Create multiple branches within the scenario to handle complex logic.
  • Merging: Combine different node branches into one, passing data through it.
  • Plug n Play Nodes: Use nodes that don’t require account credentials.
  • Ask AI: Use the GPT-powered option to add AI capabilities to any node.
  • Wait: Set waiting times, either for intervals or until specific dates.
  • Sub-scenarios (Nodules): Create sub-scenarios that are encapsulated in a single node.
  • Iteration: Process arrays of data when needed.
  • Code: Write custom code or ask our AI assistant to do it for you.
5

JavaScript

6

AI Anthropic Claude 3

+
7

Acuity Scheduling

1

Trigger on Webhook

2

Microsoft Power BI

3

Iterator

+
4

Webhook response

Save and Activate the Scenario

After configuring Microsoft Power BI, Acuity Scheduling, and any additional nodes, don’t forget to save the scenario and click "Deploy." Activating the scenario ensures it will run automatically whenever the trigger node receives input or a condition is met. By default, all newly created scenarios are deactivated.

Test the Scenario

Run the scenario by clicking “Run once” and triggering an event to check if the Microsoft Power BI and Acuity Scheduling integration works as expected. Depending on your setup, data should flow between Microsoft Power BI and Acuity Scheduling (or vice versa). Easily troubleshoot the scenario by reviewing the execution history to identify and fix any issues.

Most powerful ways to connect Microsoft Power BI and Acuity Scheduling

Acuity Scheduling + Google Sheets + Microsoft Power BI: When a new appointment is scheduled in Acuity Scheduling, the appointment data is added to a Google Sheet. Microsoft Power BI then uses this data to update its dashboards and reports.

Microsoft Power BI + Acuity Scheduling + Slack: Microsoft Power BI monitors appointment data. When a significant drop in scheduled appointments is detected, the system sends a notification to a designated Slack channel to alert the team.

Microsoft Power BI and Acuity Scheduling integration alternatives

About Microsoft Power BI

Use Power BI in Latenode to automate report generation and data analysis. Trigger report refreshes based on real-time events, then use Latenode to share insights across your team via Slack, email, or other apps. Automate your analytics pipeline and react faster, without manual Power BI updates. Latenode adds scheduling and distribution.

About Acuity Scheduling

Automate appointment scheduling with Acuity inside Latenode. Sync appointments to calendars, send reminders, and update CRMs automatically. Ditch manual data entry and build custom workflows using Latenode’s visual editor and API-first design. Scale your scheduling processes without code or per-step pricing limits.

See how Latenode works

FAQ Microsoft Power BI and Acuity Scheduling

How can I connect my Microsoft Power BI account to Acuity Scheduling using Latenode?

To connect your Microsoft Power BI account to Acuity Scheduling on Latenode, follow these steps:

  • Sign in to your Latenode account.
  • Navigate to the integrations section.
  • Select Microsoft Power BI and click on "Connect".
  • Authenticate your Microsoft Power BI and Acuity Scheduling accounts by providing the necessary permissions.
  • Once connected, you can create workflows using both apps.

Can I visualize scheduled appointments in Power BI?

Yes, you can! Latenode allows you to seamlessly transfer Acuity Scheduling data to Microsoft Power BI, providing powerful visual reporting for appointment trends and business performance.

What types of tasks can I perform by integrating Microsoft Power BI with Acuity Scheduling?

Integrating Microsoft Power BI with Acuity Scheduling allows you to perform various tasks, including:

  • Automatically updating Power BI dashboards with new Acuity Scheduling appointments.
  • Creating reports on appointment types and revenue generated from each type.
  • Tracking customer booking behavior and identifying peak appointment times.
  • Sending appointment reminders via email or SMS based on Power BI data analysis.
  • Combining appointment data with other business metrics for holistic reporting.

How do I handle errors in my Power BI workflows?

Latenode offers robust error handling, including detailed logs and customizable alerts, ensuring smooth Microsoft Power BI workflow execution.

Are there any limitations to the Microsoft Power BI and Acuity Scheduling integration on Latenode?

While the integration is powerful, there are certain limitations to be aware of:

  • Historical data import from Acuity Scheduling may require custom scripting.
  • Complex data transformations in Power BI might require advanced Latenode logic.
  • The number of API requests is subject to the rate limits of both apps.

Try now