Smartsheet and Formstack Integration

90% cheaper with Latenode

AI agent that builds your workflows for you

Hundreds of apps to connect

Automatically populate Smartsheet with Formstack submissions, centralizing your data collection. Latenode's visual editor and affordable execution pricing make complex conditional logic easy, while advanced JavaScript support unlocks limitless customization.

Smartsheet + Formstack integration

Connect Smartsheet and Formstack in minutes with Latenode.

Start for free

Automate your workflow

Swap Apps

Smartsheet

Formstack

Step 1: Choose a Trigger

Step 2: Choose an Action

When this happens...

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

description of the trigger

Name of node

action, for one, delete

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Do this.

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

description of the trigger

Name of node

action, for one, delete

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Try it now

No credit card needed

Without restriction

How to connect Smartsheet and Formstack

Create a New Scenario to Connect Smartsheet and Formstack

In the workspace, click the β€œCreate New Scenario” button.

Add the First Step

Add the first node – a trigger that will initiate the scenario when it receives the required event. Triggers can be scheduled, called by a Smartsheet, triggered by another scenario, or executed manually (for testing purposes). In most cases, Smartsheet or Formstack will be your first step. To do this, click "Choose an app," find Smartsheet or Formstack, and select the appropriate trigger to start the scenario.

Add the Smartsheet Node

Select the Smartsheet node from the app selection panel on the right.

+
1

Smartsheet

Configure the Smartsheet

Click on the Smartsheet node to configure it. You can modify the Smartsheet URL and choose between DEV and PROD versions. You can also copy it for use in further automations.

+
1

Smartsheet

Node type

#1 Smartsheet

/

Name

Untitled

Connection *

Select

Map

Connect Smartsheet

Sign In
⏡

Run node once

Add the Formstack Node

Next, click the plus (+) icon on the Smartsheet node, select Formstack from the list of available apps, and choose the action you need from the list of nodes within Formstack.

1

Smartsheet

βš™

+
2

Formstack

Authenticate Formstack

Now, click the Formstack node and select the connection option. This can be an OAuth2 connection or an API key, which you can obtain in your Formstack settings. Authentication allows you to use Formstack through Latenode.

1

Smartsheet

βš™

+
2

Formstack

Node type

#2 Formstack

/

Name

Untitled

Connection *

Select

Map

Connect Formstack

Sign In
⏡

Run node once

Configure the Smartsheet and Formstack Nodes

Next, configure the nodes by filling in the required parameters according to your logic. Fields marked with a red asterisk (*) are mandatory.

1

Smartsheet

βš™

+
2

Formstack

Node type

#2 Formstack

/

Name

Untitled

Connection *

Select

Map

Connect Formstack

Formstack Oauth 2.0

#66e212yt846363de89f97d54
Change

Select an action *

Select

Map

The action ID

⏡

Run node once

Set Up the Smartsheet and Formstack Integration

Use various Latenode nodes to transform data and enhance your integration:

  • Branching: Create multiple branches within the scenario to handle complex logic.
  • Merging: Combine different node branches into one, passing data through it.
  • Plug n Play Nodes: Use nodes that don’t require account credentials.
  • Ask AI: Use the GPT-powered option to add AI capabilities to any node.
  • Wait: Set waiting times, either for intervals or until specific dates.
  • Sub-scenarios (Nodules): Create sub-scenarios that are encapsulated in a single node.
  • Iteration: Process arrays of data when needed.
  • Code: Write custom code or ask our AI assistant to do it for you.
5

JavaScript

βš™

6

AI Anthropic Claude 3

βš™

+
7

Formstack

1

Trigger on Webhook

βš™

2

Smartsheet

βš™

βš™

3

Iterator

βš™

+
4

Webhook response

Save and Activate the Scenario

After configuring Smartsheet, Formstack, and any additional nodes, don’t forget to save the scenario and click "Deploy." Activating the scenario ensures it will run automatically whenever the trigger node receives input or a condition is met. By default, all newly created scenarios are deactivated.

Test the Scenario

Run the scenario by clicking β€œRun once” and triggering an event to check if the Smartsheet and Formstack integration works as expected. Depending on your setup, data should flow between Smartsheet and Formstack (or vice versa). Easily troubleshoot the scenario by reviewing the execution history to identify and fix any issues.

Most powerful ways to connect Smartsheet and Formstack

Formstack + Smartsheet + Slack: When a new form submission is received in Formstack, a new row is added to a Smartsheet project tracker. Then, a notification is sent via Slack to the project manager.

Formstack + Smartsheet + Google Sheets: New form data from Formstack is added to a Smartsheet. Then, the updated Smartsheet data triggers updates to calculations and summaries in Google Sheets.

Smartsheet and Formstack integration alternatives

About Smartsheet

Use Smartsheet in Latenode to automate project tracking and data collection. Update sheets from any trigger, like form submissions or database changes. Automate reporting by sending data to other apps and skip manual updates. Low-code tools and JS nodes add custom logic for advanced workflow control.

About Formstack

Use Formstack with Latenode to capture data via forms and automatically trigger workflows. Update databases, send notifications, or create documents based on submissions. Latenode adds logic, routing, and integrations to scale Formstack beyond simple data collection with visual tools and custom code.

See how Latenode works

FAQ Smartsheet and Formstack

How can I connect my Smartsheet account to Formstack using Latenode?

To connect your Smartsheet account to Formstack on Latenode, follow these steps:

  • Sign in to your Latenode account.
  • Navigate to the integrations section.
  • Select Smartsheet and click on "Connect".
  • Authenticate your Smartsheet and Formstack accounts by providing the necessary permissions.
  • Once connected, you can create workflows using both apps.

Can I automatically update Smartsheet from new Formstack submissions?

Yes, you can! Latenode lets you instantly update Smartsheet with new Formstack entries. This eliminates manual data entry, saving time and improving accuracy with flexible logic.

What types of tasks can I perform by integrating Smartsheet with Formstack?

Integrating Smartsheet with Formstack allows you to perform various tasks, including:

  • Create new Smartsheet rows from Formstack submissions automatically.
  • Update existing Smartsheet rows based on form data.
  • Trigger email notifications upon specific form submissions.
  • Archive form submissions into a dedicated Smartsheet sheet.
  • Generate summary reports in Smartsheet from Formstack entries.

HowdoesLatenodehandlecomplexdatabetweenSmartsheetandFormstack?

Latenode uses data mapping to handle complex data, allowing you to transform and format data seamlessly between Smartsheet and Formstack using its advanced code blocks.

Are there any limitations to the Smartsheet and Formstack integration on Latenode?

While the integration is powerful, there are certain limitations to be aware of:

  • Large data volumes may impact processing speed.
  • Complex form structures might require custom data mapping.
  • Real-time updates are subject to API rate limits of both services.

Try now