Awork and Microsoft Power BI Integration

90% cheaper with Latenode

AI agent that builds your workflows for you

Hundreds of apps to connect

Combine Awork project data with Microsoft Power BI dashboards for enhanced reporting and resource allocation. Latenode's visual editor simplifies the data pipeline, while affordable execution pricing optimizes costs as your reporting scales.

Awork + Microsoft Power BI integration

Connect Awork and Microsoft Power BI in minutes with Latenode.

Start for free

Automate your workflow

Swap Apps

Awork

Microsoft Power BI

Step 1: Choose a Trigger

Step 2: Choose an Action

When this happens...

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

description of the trigger

Name of node

action, for one, delete

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Do this.

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

action, for one, delete

Name of node

description of the trigger

Name of node

action, for one, delete

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Try it now

No credit card needed

Without restriction

How to connect Awork and Microsoft Power BI

Create a New Scenario to Connect Awork and Microsoft Power BI

In the workspace, click the β€œCreate New Scenario” button.

Add the First Step

Add the first node – a trigger that will initiate the scenario when it receives the required event. Triggers can be scheduled, called by a Awork, triggered by another scenario, or executed manually (for testing purposes). In most cases, Awork or Microsoft Power BI will be your first step. To do this, click "Choose an app," find Awork or Microsoft Power BI, and select the appropriate trigger to start the scenario.

Add the Awork Node

Select the Awork node from the app selection panel on the right.

+
1

Awork

Configure the Awork

Click on the Awork node to configure it. You can modify the Awork URL and choose between DEV and PROD versions. You can also copy it for use in further automations.

+
1

Awork

Node type

#1 Awork

/

Name

Untitled

Connection *

Select

Map

Connect Awork

Sign In
⏡

Run node once

Add the Microsoft Power BI Node

Next, click the plus (+) icon on the Awork node, select Microsoft Power BI from the list of available apps, and choose the action you need from the list of nodes within Microsoft Power BI.

1

Awork

βš™

+
2

Microsoft Power BI

Authenticate Microsoft Power BI

Now, click the Microsoft Power BI node and select the connection option. This can be an OAuth2 connection or an API key, which you can obtain in your Microsoft Power BI settings. Authentication allows you to use Microsoft Power BI through Latenode.

1

Awork

βš™

+
2

Microsoft Power BI

Node type

#2 Microsoft Power BI

/

Name

Untitled

Connection *

Select

Map

Connect Microsoft Power BI

Sign In
⏡

Run node once

Configure the Awork and Microsoft Power BI Nodes

Next, configure the nodes by filling in the required parameters according to your logic. Fields marked with a red asterisk (*) are mandatory.

1

Awork

βš™

+
2

Microsoft Power BI

Node type

#2 Microsoft Power BI

/

Name

Untitled

Connection *

Select

Map

Connect Microsoft Power BI

Microsoft Power BI Oauth 2.0

#66e212yt846363de89f97d54
Change

Select an action *

Select

Map

The action ID

⏡

Run node once

Set Up the Awork and Microsoft Power BI Integration

Use various Latenode nodes to transform data and enhance your integration:

  • Branching: Create multiple branches within the scenario to handle complex logic.
  • Merging: Combine different node branches into one, passing data through it.
  • Plug n Play Nodes: Use nodes that don’t require account credentials.
  • Ask AI: Use the GPT-powered option to add AI capabilities to any node.
  • Wait: Set waiting times, either for intervals or until specific dates.
  • Sub-scenarios (Nodules): Create sub-scenarios that are encapsulated in a single node.
  • Iteration: Process arrays of data when needed.
  • Code: Write custom code or ask our AI assistant to do it for you.
5

JavaScript

βš™

6

AI Anthropic Claude 3

βš™

+
7

Microsoft Power BI

1

Trigger on Webhook

βš™

2

Awork

βš™

βš™

3

Iterator

βš™

+
4

Webhook response

Save and Activate the Scenario

After configuring Awork, Microsoft Power BI, and any additional nodes, don’t forget to save the scenario and click "Deploy." Activating the scenario ensures it will run automatically whenever the trigger node receives input or a condition is met. By default, all newly created scenarios are deactivated.

Test the Scenario

Run the scenario by clicking β€œRun once” and triggering an event to check if the Awork and Microsoft Power BI integration works as expected. Depending on your setup, data should flow between Awork and Microsoft Power BI (or vice versa). Easily troubleshoot the scenario by reviewing the execution history to identify and fix any issues.

Most powerful ways to connect Awork and Microsoft Power BI

Awork + Google Sheets + Microsoft Power BI: When a new time entry is recorded in Awork, the data is added to a Google Sheet. Microsoft Power BI then uses this data (potentially combined with other data in the sheet) to update its dashboards and reports, providing real-time insights into project hours.

Awork + Microsoft Power BI + Slack: Microsoft Power BI monitors project budgets based on time tracked in Awork. When Power BI detects a budget overrun based on Awork data, a notification is sent to project managers in Slack.

Awork and Microsoft Power BI integration alternatives

About Awork

Manage Awork tasks in Latenode to automate project updates and reporting. Trigger flows on new tasks, sync deadlines across tools, or create custom reports. Use Latenode's logic functions and webhooks to connect Awork to any system, crafting automated workflows without complex coding, and scale project management tasks efficiently.

About Microsoft Power BI

Use Power BI in Latenode to automate report generation and data analysis. Trigger report refreshes based on real-time events, then use Latenode to share insights across your team via Slack, email, or other apps. Automate your analytics pipeline and react faster, without manual Power BI updates. Latenode adds scheduling and distribution.

See how Latenode works

FAQ Awork and Microsoft Power BI

How can I connect my Awork account to Microsoft Power BI using Latenode?

To connect your Awork account to Microsoft Power BI on Latenode, follow these steps:

  • Sign in to your Latenode account.
  • Navigate to the integrations section.
  • Select Awork and click on "Connect".
  • Authenticate your Awork and Microsoft Power BI accounts by providing the necessary permissions.
  • Once connected, you can create workflows using both apps.

Can I visualize Awork project data in Power BI?

Yes, easily! Latenode's visual editor lets you map Awork data to Power BI datasets, creating insightful dashboards with no code. Get real-time project overviews.

What types of tasks can I perform by integrating Awork with Microsoft Power BI?

Integrating Awork with Microsoft Power BI allows you to perform various tasks, including:

  • Automatically updating Power BI dashboards with new Awork project data.
  • Creating reports on team performance based on Awork task completion.
  • Tracking project budgets in Power BI using Awork time tracking data.
  • Generating custom alerts in Power BI based on Awork project status changes.
  • Analyzing resource allocation across projects using Awork and Power BI.

How secure is my Awork data within Latenode workflows?

Latenode uses advanced encryption and secure data handling, safeguarding your Awork data throughout all automation workflows for maximum protection.

Are there any limitations to the Awork and Microsoft Power BI integration on Latenode?

While the integration is powerful, there are certain limitations to be aware of:

  • Real-time data updates depend on the Awork and Power BI API refresh rates.
  • Complex data transformations may require JavaScript knowledge.
  • Historical data import from Awork to Power BI may require batch processing.

Try now